Monday, April 22, 2013

GLHA Expansion

A photo from the new concrete float down at the GLHA. A great exciting project, it means that fishing and other vessels will find it much easier to load and unload as they come into Gibsons. We have watched over the last month as they have built this, pounding those posts into the sea bed and watched concrete trucks deliver in gale force winds, we had a ring side seat most days and even paddled underneath the ramp last Friday whilst all four of us made silly whooping noises.

Today

Up to date, they're framing the first floor now, also the property has gone on the market, price will be $478,000 plus taxes and the old land transfer wrinkle. Will post more pictures as the monster grows.

Project poured and basement framed

This was taken on the 17th April, the concrete has been poured, the forms stripped away, the basement has been framed and the first floor plywood has been added.

The New project over the road

A couple of updates of the project over the road, every day there is progress and the house is being created in record style.
The concrete forms went in around the 21st March.

Sunday, March 31, 2013

Three Months

The cut the cord experiment is three months and counting. The photo below is the 8 bay antenna that we installed on the side of the house and our location provides half a dozen digital TV channels via an ATSC tuner. In addition we have a streaming and PVR setup that involves two dedicated (and quiet) PCs with a Roku and a 3rd Generation Apple TV box.

In Canada, most networks provide online access to full shows the day after they are broadcast, in addition, we have subscribed to a digital VPN which provides worldwide on-demand access to shows from global networks.

So much telly, so little time!

Monday, March 25, 2013

Lunch impending

We're smiling because we know the Black Bean cafe is only ten minutes away. Today it was a delicate homemade curry lentil soup with doorsteps of fresh bread.